Best Performance (2001)
Total Installed
75.000 tons Installed at 9 sites
Combined Cycle Power Plants
62.000 tons
10 x Fr9FA CTGs
5 x 50 STF30C STGs
10 x Vertical HRSGs
3 x Natural Draught Cooling System
2 x Forced Draught Cooling System
5.000 tons Power and Process Piping
Spherical LPG Tanks
6.000 tons

Cylindrical LNG Tanks

5.000 tons

Cement Plants

2.000 tons

4.3 million man-hours without Lost Time Accident (LTA)