Best
Performance (2001)
Total Installed
75.000 tons
Installed at 9 sites
Combined
Cycle Power Plants
62.000
tons
10
x Fr9FA CTGs
5
x 50 STF30C STGs
10
x Vertical HRSGs
3
x Natural Draught Cooling System
2
x Forced Draught Cooling System
5.000
tons Power and Process Piping
Spherical
LPG Tanks
6.000
tons
Cylindrical LNG Tanks 5.000 tons Cement Plants 2.000 tons
4.3 million man-hours
without
Lost Time Accident (LTA)
|
|
![]()
|