|
Jan '07:
Heaviest Pressure Vessel (1050 tons) (Under Fabrication) Cimtas has undertaken the design, engineering, supply and fabrication of a single piece 1.050 tons CO2 Absorber for the Angola LNG project with ID, thickness and length of 5.260 mm, 162/163 mm and 48.100 mm respectively. This vessel is under fabrication and is scheduled to be completed in Q1 2009 |
![]() |
![]() |